The house is going through all the rounds of inspection before the interior can come together. The water, sewer, electrical and cable lines all still need to come in from the street before the yard can be back filled. The garage floor still needs to be leveled and poured. Ohh...and we need insulation, drywall, floors, mouldings, cabinets, light fixtures. Ahhh! The builder is still saying we're on target with a Nov 3rd close date. Rrrrrright.
Here are a few pictures of our electricians handy work...you would think we're supplying power to the whole town. Everywhere you look there is wires, outlets, light boxes, recessed lights. It's like a big maze.
Can you tell that Dave (also type A) did these wires below?
And here's the little devil right before she started running around the house and giving me a heart attack. She look so innocent...
Not much to report but hopefully things will be moving faster soon.........